Customization: | Available |
---|---|
After-sales Service: | 24 Hours Online Service and Door-to-Door Service |
Warranty: | 3 Year Warranty |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
High Quality Industrial Equipment CNC Router Machine 1325 Woodworking Machine 3D Wood Carving 5 Axis CNC Router Machine |
Parameters:
|
Standard Specifications
|
X and Y axis working area
|
1300*2500mm
Optional : 1500*3000mm; 2000*3000mm, 2000*4000mm etc |
Z axis Travel
|
700mm
Optional: 600mm, 800mm, 900mm, 1000mm, 1200mm, etc |
Spindle Type
|
18KW 5 axis Italy ATC spindle, HSK F63
Optional: HSD 13.5KW, HITECO 15kw |
Inverter type
|
Taiwan Delta Inveter
|
Tool magazine
|
8 position Disc automatic tool changer
Optional:10/12/14/16/18/20/22/24 |
Tool holder
|
HSK F63
|
Operating system
|
Syntec 610-E5 5 axis control system (Optional: SIEMENS control system )
|
Driving system
|
Yaskawa servo motor and driver (Optional: SIEMENS servo motor and driver )
|
Reducer
|
Japan SHIMPO reducer
|
Max. Rapid Travel Rate:
|
80m/min
|
Max. Working Speed:
|
0-50m/min
|
Working voltage
|
380V/50HZ/3Phase
|
After-sales service
1. All machine will be tested before shipment.
2. 24 months warranty except man-made fault.
3. 24 hours technical support by email, telephone or video online.
4. During the warranty , if Large size foam cnc 4 axis router 1530 with 3 years warranty with CE is broken due to the quality,we can do free maintenance and provide the needed spare parts until it's good to working.
5. We provide long time technical support ,online and telephone service.
After machine is finished, our engineer will operate the machine for testing, the test video will send to our clients for check, everything is ok, we will arrange packing.
1. Packed the machine with plastic sheet for clearing and damp proofing.
2. Then put the machine in the plywood case for safety.
3. Transport the plywood case into the container.